Wednesday 14 of May of 2025
BZ in Action!!!
Last week, we began executing a new contract with HAUG Ltda. This time, it involves the calibration of 45 horizontal cylindrical tanks with hemispherical heads for the storage of Liquefied Petroleum Gas at Enap’s Maipú DAO Plant. The first four tanks were calibrated on Saturday, and the Calibration Tables are currently being developed.
Technical Challenges
- Measurements in long, wide-diameter horizontal tanks.
- Volume calculation of hemispherical heads based on their configuration.
- Corrections for temperature, density, working pressure, and inclination.
Our Solution
- Use of advanced technology (Laser Total Station and pressure/temperature sensors).
- Standardized procedures to ensure data consistency.
- Preparation of Calibration Tables that accurately reflect internal volumes.
Thanks to the BZ Team, we transform every challenge into an opportunity to demonstrate The Value of Experience, delivering reliable results and the technical support our clients need.