+56 9 91785966
[email protected]
Go Back to News BZ in Action! Cubing of three LPG transfer lines in Quintero

Monday 4 of August of 2025

BZ in Action! Cubing of three LPG transfer lines in Quintero

This week, we were at the Gasmar Terminal in Quintero with our Surveyor Engineer to perform the volume measurement of three liquefied petroleum gas (LPG) transfer lines, each measuring over 1,000 meters in length.

To perform the survey with the highest precision and with satellite georeferencing, we used the Trimble R10 GNSS System, Trimble TSC3 Controller, and Sokkia CX-105 Total Station.

A job well done, backed by the Value of Experience. BZ!!!

BZ Consulting, “The Value of Experience”